Motor

It's important first to understand BLPM motors. There are several types that operate in a different way and some very good text books on the topic are Hendershot & Miller (2010) or Hanselman (2004).

If you deal with radial flux BLPM motors, anaytical packages such PC-BDC (SPEED) can give you very good results for surface PM motors, while for interior PM motors FEA is absolutely necessary, e.g. PC-FEA which is embedded in SPEED . Most of the finite-element packages will give you similar results, difference is made in price, computation time and easiness of usage.
Last, but not least, thermal aspects in BLPM are usually neglected even though magnets will demagnetise with temperature leading to higher current and lower efficiency for the same output. FEA will fail to give you a good estimation of the motor thermal behavior being capable of modelling just conduction. MotorCAD can solve the thermal problems and is linked to SPEED.
For axial flux motor you will need to go into 3D FEA. There are several analytical approaches developed at various Universities worldwide.

There are a lot of subtleties to designing BLPM motors, some not immediately obvious, particularly if you want an IPM motor with wide field weakening or something. It is often easy to get something that will do, but hard to get a really good design that is high efficiency and maximizes the material. FEA software, even ones with front ends for entering geometrical data, will have more limited options and gives one answer; the time it takes to vary parameters and formulate an effective design can be very long. SPEED is a spreadsheet entry package with many powerful design options and routines, It is by far more sophisticated than any of the FEA packages in terms of design variety. RMXpert is simply an FEA bolt on.
There are some customers out there that have their larger motors repaired at one facility and their smaller motors repaired at others. There are also customers who expect you to take care of all their motor repairs no matter how small or how large.

It has become increasingly difficult to make a profit by repairing smaller motors, so when they are standard / off the shelf motors there is a small profit to be made by replacing the motor as opposed to a loss when the motor is repaired. In the case of smaller Specialty or OEM motors the repair price is most often more expensive than new but sometimes the new motor has an extended delivery. In cases like this when delivery is a factor we give a fixed price prior to repair. In 99% of these cases the customer will tell us to proceed. The internet has made it much easier to source the OEM Motor and obtain a price and delivery quite quickly.

Where we will subcontract a repair to another facility is on the rewind of small armatures. Most of the larger facilities do not have the equipment required to economically rewind a small armature but there are some shops that specialize in that aspect of motor repair. we rarely encounter any problems when we subcontract this type of work. We do al the dismantling and assembly work that is required and we get a price ahead of time from the subcontractor. the customer gets the total price ahead of time and issues a purchase order or gives a verbal go ahead. The only time we run into problems is when the subcontractor does not meet the delivery date.
Introduction: As electrical professionals, many of us would have been handling electric motors in hundreds of numbers over the years in our careers. And, whatever the SI System of units might suggest, many of us would still prefer to refer to electric motors' power rating in horse power only rather than in watts or kilowatts as is prescribed in the SI System of units. But, how many of us know why this is so? Why electric motors are rated in horsepower? Why not in Elephant Power, as somebody asked this author?

The story: One would be surprised to note that the rating of electric motors in horsepower has nothing to do with any electrical professional in the first place. It all started with one James Watt. Recall him? He is a Scottish engineer, associated with the Steam Engine. In most of the children's general knowledge books, James Watt is wrongly credited with the invention of the Steam Engine. That credit goes to one Thomas Newcomen of England, who, in fact, had invented the Steam engine in 1705. James Watt only made improvements to the Newcomen Engine, to improve its efficiency and to make it commercially viable. This was in the year 1769.

Having made this improvement, Watt started manufacturing these engines, in a partnership with a businessman called Matthew Boulton and started looking for markets for his engine. Remember! It was the 18th century. And the industrial revolution was in its primitive stages in England. The main profession of world's population was only agriculture. The only customers, to whom Watt could sell his engine, were farmers. Watt started talking to farmers, with a view to market his engine to them. They wanted to know what his engine could do for them. Watt knew that an engine is a device that could do some work. What work that a farmer is more interested in? That of drawing water from a deep well and of irrigating his fields.
I'd be very careful about surge testing motors in industrial environments. There is specific guidance from IEEE, NEMA and EASA that talks about surge testing being potentially destructive when done on motors in the field. More specifically, motors with unknown insulation conditions. Surge and hi pot testing are geared for shop testing on repaired or new motors. I'd recommend monitoring online impedance imbalance and current imbalance. We've seen many case studies where these two parameters were early indicators of stator faults. I agree that offline, phase to phase resistance and inductance can be great indicators of stator faults. The downside of offline testing is the fact the motor has to be shutdown.

We also recommend looking for faults conducive to stator failures. For example, if you have a high restive imbalance on the circuit this can increase heat inside the motor. The increased heat further stresses the insulation system and can lead to bigger insulation or stator failures. If we could have found the small problem, ie. resistance imbalance, then we could have prevented the stator fault.

Stator is a tricky fault zone because faults typically develop so quickly. With a good overall motor testing program you can find the faults that lead to stator issues and get them corrected early.
I was trying to point out that impedance imbalance and current imbalance can act as good indicators for stator issues. It seemed to me that most people in the discussion we're focusing on offline tests and there wasn't much mention of online stator testing.
I am not a manufacturer of motors, except for the modification of specialty applications. For example we changed out several hundred motors for the National Weather Service contained in a dipole antenna body. Existing motor was a single phase permanent split capacitor synchronous motor, 110 volt, 1800 RPM DESIRED, due to a feedback tachometer mounted on the motor to verify the speed as these receivers accepted upper air feedback of weather conditions, from weather balloons launched two to three times a day. Location and tracking of the balloons were critical, if the tach feedback was off by one rpm [from 1800] the tracking electronics could not deal with the inconsistency.

I attempted to purchase motors for this application, but because the motor was mounted vertically in a solid cone, no ventilation, plus they were single phase, with induction synchronous rotors, voltage was a consideration, and the units were mounted from Hawaii to Guam to Florida, across the US and Territories.

I took the existing single phase PSC SYNCH MOTOR, which few ever had the torque, or would stay at 1800 rpm, or fail do to the heat.

While they only needed around 300 plus active motors, they needed half as many as spares, considering the past history of failures and the lack of ability to deliver accurate timely weather data over an exact path.

It was not a case of excessive NOISE, it was a case of perceived sound, it sounded different, so for those involved with any Governmental Agency knows that form, fit, function is their mantra and excuse to not accept anything.

We had several complaints of noise, turns out the noise was in no way a danger or at levels of any concern, just different.

While testing 4. 6. 8. 2 pole motors for "noise" in a controlled environment, is only data from those conditions, out in the wild west, those conditions are going to change, mounting, structure, all explained above will affect the motor's "noise" levels, or perceived "noise" levels.

In the fact that no load, [NEMA] testing is not going to be exacting as other possible more exacting, different parameter type testing, if noise is a concern, is under full load, which again is a variable.
You can divide the synchronous machines in 2 groups, based on the principle they employ to generate torque:
- interaction of 2 independent fields, one generated on stator and the other on the rotor: let's call this group "excited" synchronous machines;
- the torque is generated by an anisotropic rotor structure and the presence of a magnetic field generated by the stator: the latter field will tend to attract the anisotropic rotor in order to minimize the reluctance of the path of the magnetic field itself; let's call this group "reluctance" machines.

Then, of course, you can also mix the 2 things, by providing an anisotropic structure with some way (see down) to independently excite a rotor field.

Now, 2 additions to the above: in the 1st group the excitation of the rotor field can be provided by both a field winding fed with current through slip-rings and brushes (the traditional power plant alternator) and then will call it "electrically excited" synchronous; or, excitation can be provided by permanent magnets placed somewhere in the rotor structure (either on the outer surface or inside), and then we'll call it "PM synchronous" machine.

Second precaution: though the physical principle is the same, *synchronous* reluctance machines are quite different from *switched* reluctance ones. The latter, in fact, have a salient structure also on the stator, the coils being supplied (a phase at a time) with DC current, that produces a magnetic field fixed in space: once the minimal reluctance position is achieved, the rotor would continue stay there (neglecting little oscillations) unless current is moved to a different phase. In *synchronous* reluctance, instead, the stator structure is more conventional, almost isotropic, and a set of AC currents is supplied to all the coils: this generates a rotating magnetic field, hence your "preferred position" is not reached and the rotor continues spinning.
Individual organizations should consider developing their own customized Motor Management plan and policy. Some of the factors to consider are: extent of the repair - is it bearings or rewind, lead time for repair vs replace (special builds vs off the shelf), cost of new vs repair, single phase vs three phase, size (HP) of the product, efficiency of the failed motor vs efficiency of the replacement motor, warranty of the new vs repaired. Each organization's criteria and situation will factor into their individual decision tree.

Before you establish what %HP of the new motor value you will spend on repair, you need to know your repair facility. Derek is correct when he says that your service center needs to be following the "EASA AR-100 Recommended Practices". Following these repair guidelines, you will not lose efficiency in the repair process, in fact on larger HP's, there maybe opportunities to gain efficiency if your EASA shop gets EASA engineering involved. Additionally, the repair center should have a recognized and accredited Quality Assurance Program, such as ISO 9000. Weighing in on your decision, compare the new motor to what you are going to get back. Typically a new Nema T frame motor will be insulation Class F (155' C), many EASA facilities will rewind with insulation Class H (180' C) and you will immediately have a 25' C advantage over new. Also, a qualified individual rewinding at an EASA repair facility is (highly) likely to produce greater quality than the factory cranking out "production". Balance standards are also typically better which will yield longer bearing life when the motor is back in service.
It appears like many contributors treat this application as if it is a distribution board that is to be supplied by a 400m cable connection. That must be the reason why so many calls for a neutral, or earth return core, as well as for the very limited allowed voltage drop during start. In many applications we directly recommend reducing the terminal voltage during start, for a number of reasons, so why should it all of a sudden become detrimental in this situation? The motor has no way of knowing what has caused the reduced starting voltage anyway! As long as there is sufficient voltage to get the drive to start within a reasonable time, the start VD should cause no headache.

One important issue that has only been briefly touched upon by a single contributor is the economy: It should be our professional endeavour to make the total cost of ownership as low as possible, so it would be reasonable to include energy cost into the equation. The heavier cable as proposed by many, will obviously reduce the running losses considerably as compared to the smallest cable that will satisfy the technical requirements.

If this motor is intended to run for only brief periods each day, or maybe for only a few days or months, it will be bad economy to choose the heavy cable just because you can. Likewise, if this installation is part of a quotation, you could very well miss out on a much larger contract, because most clients will only look at the total sum, before addressing any technical issues.
What happens at the manufacturer is that the specification for equipment is written (by the end user, or some hired intermediary) around some operating point ... and most often, that point is the "full load" or "100 percent" rating of the machine. Therefore, the design effort goes into making that specified operating point the best possible in a variety of terms, including: optimizing material usage during manufacture, minimizing material and labor costs during manufacture, optimizing the spectrum of performance criteria (including efficiency at the specified operating point), maximizing overall equipment reliability, minimizing personnel hazards during manufacture and operation, and maximizing accessibility for maintenance purposes. Sometimes one choice benefits more than one result ... but far more often, there is a trade off between the benefits and some determination is made on what is most "important". And as we are all different human beings, so too does the heirarchy change from one consumer to the next.

The difficulty - as you've already noted - arises when the SPECIFIED performance requirement (i.e. full load) is not the same as the ACTUAL performance requirement.